基于模糊层次综合评价法的将淖二线接轨方案研究
基金项目(Foundation): 国家自然科学基金项目(72171174); 陕西省博士后科研项目(2023BSHGZZHQYXMZZ12); 中铁第一勘察设计院集团有限公司博士后科研项目(BSHGZZKY-PT01)
邮箱(Email):
DOI: 10.16468/j.cnki.issn1004-0366.2026.01.001
摘要:

将淖铁路增建二线是疆煤外运通道扩能的重点工程,对完善地区路网结构具有重要意义,是综合交通网“补网强链”的重要举措。铁路增建二线接轨方案的比选涉及多目标、多层次的指标要素,因此需对科学、合理的方案决策方法进行研究。引入模糊层次综合评价理论,针对将淖二线引入淖毛湖地区接轨方案,建立了包含3项一级指标、8项二级指标的层次分析结构,计算了各层次指标综合权重,最终得出推荐布拉克接轨方案的结论。研究表明,引入的模糊层次综合评价法具有理论依据充分、评价准确、比选直观的优点,对铁路增建二线设计工作具有指导意义。

Abstract:

The second line of the Jiang-Nao railway is a key project for the expansion of the Xinjiang coal transportation channel, which is of great significance for the improvement of the regional road network structure.As the main measure of the comprehensive transportation network "complementing the network and strengthening the chain",the second line of the railroad construction involves multi-objective, multi-level selection of indicators, which is necessary to study the decision-making method of the program in a scientific and reasonable way.This paper introduces the fuzzy hierarchical comprehensive evaluation theory for the Jiang-Nao second line in the Naomaohu area of the connection program.The establishment of a hierarchical analysis structure containing three primary indicators, eight secondary indicators, the comprehensive weights of the indicators of the various levels are calculated, and the final recommended conclusions for the Bulake connecting program are proposed.The study shows that the introduced fuzzy hierarchical comprehensive evaluation method has the advantages of strong theoretical basis, accurate evaluation and intuitive comparison, which is of guiding significance for the design of the second line of railroad construction.

参考文献

[1] 交通运输部.关于印发扎实推动“十四五”规划交通运输重大工程项目实施工作方案的通知:交办规划[2022]21号[EB/OL].(2022-05-20)[2024-08-19].https://xxgk.mot.gov.cn/jigou/zhghs/202205/t20220520_3656075.html.

[2] CANCO I,KRUJA D,IANCU T.AHP,a reliable method for quality decision making:a case study in business[J].Sustainability,2021,13(24):13932.

[3] SUMAN M N H,CHYON F A,AHMMED M S.Business strategy in Bangladesh—electric vehicle SWOT-AHP analysis:case study[J].International Journal of Engineering Business Management,2020,12.

[4] CHINNASAMY S,RAMACHANDRAN M,SARAVANAN V,et al.Definition of negative outcomes in solid organ transplantation using grey relational analysis (GRA) method[J].Journal on Materials and Its Characterization,2023,2(4):10-19.

[5] YUCESAN M,GUL M.Hospital service quality evaluation:an integrated model based on Pythagorean fuzzy AHP and fuzzy TOPSIS[J].Soft Computing,2020,24(5):3237-3255.

[6] CHEN C H.A novel multi-criteria decision-making model for building material supplier selection based on entropy-AHP weighted TOPSIS[J].Entropy,2020,22(2):259.

[7] NI X,LI J,XU J Y,et al.Grey relation analysis and multiple criteria decision analysis method model for suitability evaluation of underground space development[J].Engineering Geology,2024(338):107608.

[8] 杨昌睿,李远富,邹鑫,等.基于组合赋权-TOPSIS的艰险山区铁路长大坡道线路方案评价方法研究[J].铁道标准设计,2021,65(3):52-58.

[9] 梁栋.基于密切值决策方法的伊阿铁路走向规划研究[J].铁道标准设计,2024,68(2):7-14.

[10] 俎保峰.岩溶区铁路综合选线及辅助决策技术研究[J].铁道标准设计,2022,66(5):38-43.

[11] 杨文昕,余磊,周锬,等.基于AHP-模糊综合评价法的兴泉铁路宁化至泉州段线路方案对比研究[J].铁道标准设计,2019,63(2):49-54.

[12] 刘玲.西十高速铁路与西安南环线联络线预留接轨方案研究[J].铁道建筑,2020,60(12):105-108.

[13] 王希良,汤雨静,孙旭,等.新建石衡沧港城际铁路引入衡水北站方案研究[J].铁道工程学报,2023,40(9):92-97.

[14] 庞庆华.现代综合评价方法与案例精选[M].北京:清华大学出版社,2021.

[15] 陈俊.长赣铁路引入黄花机场方案研究[J].铁道运输与经济,2023,45(10):119-126.

[16] 袁俊辉.伊阿铁路引入伊宁铁路地区接轨方案研究[J].铁道运输与经济,2021,43(3):93-99,108.

[17] 王作磊,张鹏.西延高速铁路引入西安北站方案研究[J].铁道标准设计,2021,65(8):13-19.

[18] 贾磊.宝中铁路增建第二线引入平凉地区方案研究[J].甘肃科学学报,2023,35(3):146-152.

基本信息:

DOI:10.16468/j.cnki.issn1004-0366.2026.01.001

中图分类号:U212

引用信息:

[1]贺艺博,袁俊辉,樊婧,等.基于模糊层次综合评价法的将淖二线接轨方案研究[J].甘肃科学学报,2026,38(01):1-8+15.DOI:10.16468/j.cnki.issn1004-0366.2026.01.001.

基金信息:

国家自然科学基金项目(72171174); 陕西省博士后科研项目(2023BSHGZZHQYXMZZ12); 中铁第一勘察设计院集团有限公司博士后科研项目(BSHGZZKY-PT01)

发布时间:

2026-01-26

出版时间:

2026-01-26

网络发布时间:

2026-01-26

检 索 高级检索